
Anti Blow-Up Tool is designed to be used as part of the toolstring when intervention operation took place in a multizone completion well where high cross flow or differential pressures is present. In the situation that the differential flow rates between zones push the toolstring upwards, the two arms on the tool will throw outward and lock into the tubing wall preventing the toolstring from blowing up.
|
Tubing Size |
Tools Body O.D. |
Fishneck O.D. |
Connection Type |
|
2 3/8〞 |
1.500" |
1.375" |
15/16"-10UN |
|
2 7/8"& 3 1/2" |
1.875" |
1.750" |
1 1/16"-10UN |
|
4 1/2" |
2.500" |
2.313" |
1 9/16"-10UN |
|
5 1/2" |
2.500" |
2.313" |
1 9/16"-10UN |